Build Order
The GTM OS is built in five phases. Each phase must be solid before moving to the next. Violating the order leads to volume without learning, brittle automations, and a system that cannot improve.
Five Phases
| Phase | Goal | Key Artifacts | Exit Criteria |
|---|---|---|---|
| 0 – Foundations | Define the core motion elements. | icp.md, personas/, plays/ (skeleton), skills/ (core), scoring.md (baseline), policies/ (baseline). | All foundational files exist and are versioned. No execution yet. |
| 1 – Engagement & Disposition Ledger | Run the motion manually and capture every outcome as a disposition. | Manual execution log, disposition ledger schema, initial evals/ (golden set seed). | You have a disposition ledger with at least 100 verified outcomes. |
| 2 – Examiner & Skill Library | Build the examiner and begin turning repeated procedures into skills. | Examiner harness, skill template, first few skills (prospecting, outreach, enrichment). | The examiner can load the golden set, replay a skill, and return a verdict. |
| 3 – Close the Loop | Ensure the disposition ledger feeds back into skill improvement via the examiner. | Closed-loop scripts, disposition → skill update workflow, versioned skill updates. | A change to a skill triggers the examiner, which returns evidence, and the skill is updated in a PR. |
| 4 – Outreach Automation | Automate the motion while preserving the feedback loop. | Outreach skill (sequences, timing), connectors (CRM, SEP), automation harness. | Automated runs produce dispositions that flow into the ledger; the examiner still catches regressions. |
| 5 – Agentic Scaling | Replace human-in-the-loop steps with agents that earn autonomy. | Agent configs, autonomy ladder, agent approval workflows, kill switch. | Agents operate at rung 3 (sample) or higher, and the human only intervenes on escalation. |
Why the Order Matters
❌ If you automate outreach before closing the loop (Phase 4 before Phase 3)
- You generate volume without learning. The disposition ledger is sparse or biased, so the examiner has little to work with.
- Any change to outreach (e.g., a new sequence) cannot be validated against outcomes because the loop is broken.
- You end up with a brittle automation that improves vanity metrics (messages sent) but not outcomes (meetings booked, deals closed).
❌ If you build skills before capturing dispositions (Phase 2 before Phase 1)
- Skills are built on assumptions, not on real outcomes. The examiner has nothing to validate against.
- You may end up with skills that look good in isolation but fail in the wild.
How to Enforce the Order
The quality gate (question 4) enforces the build order. A custom script checks that no PR introduces a forward dependency.
- Adding a file under
skills/outreach/before the disposition ledger has a sufficient number of verified outcomes (configurable threshold) will fail. - Adding an automation harness (e.g., a cron that runs sequences) before the examiner is operational will fail.
Diagrams
Below is a flowchart showing the build order and feedback loops.
flowchart LR
A[Phase 0: Foundations] --> B[Phase 1: Engagement & Ledger]
B --> C[Phase 2: Examiner & Skill Library]
C --> D[Phase 3: Close the Loop]
D --> E[Phase 4: Outreach Automation]
E --> F[Phase 5: Agentic Scaling]
style A fill:#f9f,stroke:#333,stroke-width:2px
style B fill:#bbf,stroke:#333,stroke-width:2px
style C fill:#bfb,stroke:#333,stroke-width:2px
style D fill:#ff9,stroke:#333,stroke-width:2px
style E fill:#f99,stroke:#333,stroke-width:2px
style F fill:#9f9,stroke:#333,stroke-width:2px
Example: Violating the Order
A PR adds a new outreach sequence under skills/outreach/sequences/ while the disposition ledger has only 20 verified outcomes (below the threshold of 100).
- The quality gate’s build-order check runs and returns:
- Failed question: 4 (Build order)
- Evidence: “Outreach automation added before disposition ledger reached 100 verified outcomes. Current count: 20.”
- The PR is blocked, and the author must either wait until the ledger has enough outcomes or provide evidence that the sequence is safe to add (e.g., it is a pure copy of an existing sequence with no behavioral change).
Related Pages
- Quality Gate – how the gate enforces the build order.
- Examiner Deep Dive – how the examiner validates changes.
- Autonomy Ladder – how agents earn the right to approve changes.
- Controls – failure modes and mitigations.
Source: GTM OS Handbook, 2026-08-27